Projects

Twelve recent installs across the Champlain Valley.

Below are 12 cold-climate heat-pump installations Voltline has completed in the past 18 months. Specs, equipment models, and outcomes are real. Customer details are anonymized at customer request.

FILTER · ALL · DUCTED · DUCTLESS · WHOLE-HOME (static grid below)

Ducted Retrofit · Burlington · 2024

1968 cape, oil boiler removed.

MITSUBISHI PUZ-HA42 · 42K BTU/h · COP 2.4 @ 5°F · $16,800 / $9,400 net

30-year oil boiler costing $4,400/season. First heat-pump heating bill: $182. Comfort delta: 4°F more even across rooms.

Case study →
4-Zone Mini-Split · Shelburne · 2024

Lakefront, no ductwork, 4 heads.

MITSUBISHI MXZ-SM48 · 48K BTU/h · COP 2.4 @ 5°F · $19,200 / $11,600 net

Mid-renovation, architect-specified system. Four indoor heads from one outdoor unit, screened with ornamental grasses.

Case study →
Whole-Home Electrification · Williston · 2025

Hyper-Heat + HPWH + 200A panel.

PUZ-HA48 + RHEEM HPWH + SQ-D PANEL · $28,400 / $14,800 with HEEHRA

New homeowner, leaking oil tank. Income-qualified for HEEHRA. Full electrification across four months.

Case study →
Single-Zone · South Burlington · 2024

Sunroom-only, ductless head.

FUJITSU AOU24RLAS · 24K BTU/h · COP 2.5 @ 5°F · $6,400 / $2,800 net

A starter install. Sunroom-only coverage, became year-round shoulder-season heat as well.

Case study →
Historic Retrofit · Hill Section, Burlington · 2024

1898 brick, discreet head placement.

MITSUBISHI MXZ-SM36 · 36K BTU/h · COP 2.4 @ 5°F · $14,200 / $8,200 net

Historic preservation context. Custom line-set routing through original chase. Three discreetly-mounted heads.

Case study →
New Construction · Charlotte · 2025

5-ton ducted, no fossil-fuel allowance.

MITSUBISHI PUZ-HA60 + DUCTED AHU · 60K BTU/h · COP 2.2 @ 5°F · $22,800 / $14,400 net

Architect-specified all-electric design from the framing stage. We installed at rough-in.

Case study →
2-Zone Mini-Split · Essex Junction · 2024

Townhouse, two-head Bosch IDS.

BOSCH IDS PREMIUM · 24K BTU/h · COP 2.2 @ 5°F · $9,800 / $5,400 net

Two indoor heads, one outdoor compressor. Townhouse association approved the discreet outdoor placement.

Case study →
Whole-Home Electrification · Hinesburg · 2025

Farmhouse, phased over 14 months.

PUZ-HA48 + HPWH + PANEL + INDUCTION/EV · $34,200 / $18,800 net

Phased project. Heat pump in April. Water heater in October. Induction pre-wire in March of the following year.

Case study →
Ducted Retrofit · Colchester · 2024

Fujitsu, existing ductwork sealed.

FUJITSU AOUH48LULH · 48K BTU/h · COP 2.3 @ 5°F · $17,400 / $10,200 net

Existing ductwork passed static pressure after sealing. Furnace removed and disposed. 2-day install.

Case study →
Lakefront Cottage · North Hero · 2024

Single-zone + HPWH, off oil completely.

MITSUBISHI MUZ-FH18 + RHEEM HPWH · $11,200 / $6,400 net

Seasonal cottage, owner wanted to come off oil before the next winter. Single mini-split + water heater.

Case study →
Modest Ranch · Saint Albans · 2025

1960s ranch, straight-up replacement.

MITSUBISHI PUZ-HA30 · 30K BTU/h · COP 2.4 @ 5°F · $14,800 / $8,400 net

Smaller house, smaller system. Same engineering rigor on a tight budget. Customer income-qualified for partial HEEHRA.

Case study →
Cold-Pocket Farmhouse · Underhill · 2024

Hyper-Heat + 15kW strip for −15°F design.

PUZ-HA42 + 15kW STRIP · 42K BTU/h · COP 2.4 @ 5°F · $18,400 / $11,200 net

Design temp pocket at −15°F. Strip ran 22 hours total over the 2024-25 heating season. System worked as modeled.

Case study →
Want one of these?

The phone consultation is free.

A Comfort Auditor walks through your home's situation, your current heating system, and the rebate stack you might qualify for. 20 minutes. No same-day pressure.

Schedule a phone consultation →
(802) 555-0149Get a quote →